PROCEDURE
INSTALL COMBINATION METER ASSEMBLY
Connect each connector.
Engage the clamp.
|
Install in this Direction |
Engage the 2 clips as shown in the illustration.
Install the combination meter assembly with the 3 screws.
INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Connect the connector.
|
Install in this Direction |
Engage the 2 guides and 4 clips as shown in the illustration.
Install the 2 clips.
|
Install in this Direction |
Engage the 4 clips and 2 claws to install the instrument cluster finish panel assembly.
INSTALL NO. 2 METER HOOD CLUSTER
INSTALL NO. 1 METER HOOD CLUSTER
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
for 2AR-FE:
for A25A-FKS:
for 2GR-FKS:
CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM (for Power Tilt and Power Telescopic Steering Column)