COMBINATION METER INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION METER ASSEMBLY


    1. Connect each connector.

    2. Engage the clamp.

    3. B0071PQC01
      B006ZFL Install in this Direction

      Engage the 2 clips as shown in the illustration.

    4. Install the combination meter assembly with the 3 screws.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY


    1. Connect the connector.

    2. B006YW1C01
      B006ZFL Install in this Direction

      Engage the 2 guides and 4 clips as shown in the illustration.

    3. Install the 2 clips.

    4. B0070ZWC01
      B006ZFL Install in this Direction

      Engage the 4 clips and 2 claws to install the instrument cluster finish panel assembly.

  3. INSTALL NO. 2 METER HOOD CLUSTER

    Click here

  4. INSTALL NO. 1 METER HOOD CLUSTER

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    for 2AR-FE:

    Click here

    for A25A-FKS:

    Click here

    for 2GR-FKS:

    Click here

  6. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM (for Power Tilt and Power Telescopic Steering Column)

    Click here