GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator assembly with the 2 bolts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
    2. Install the wire harness clamp bracket with the bolt to the generator assembly.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Connect the 4 wire harness clamps.

    4. Connect the engine oil pressure switch assembly connector.

    5. Connect the generator assembly connector.

    6. Connect the wire harness to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    7. Install the terminal cap.

  2. INSTALL V-RIBBED BELT

    Click here

  3. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  4. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here