PROCEDURE
INSTALL INTAKE MANIFOLD
Install the wire harness clamp bracket to the intake manifold with the bolt.
| *a | Black |
Connect the 2 vacuum hoses and check that the No. 1 check valve is installed as shown in the illustration.
w/ TCV:
Check the 4 tumble control valves (TCV).
Note
The 4 tumble control valves (TCV) may be damaged if they are not closed before installing the intake manifold.
Tech Tips
Apply battery voltage to the terminals of the intake air control valve actuator (for TCV) to operate the motor and close the 4 tumble control valves (TCV).
Install a new intake manifold to head gasket to the intake manifold.
Temporarily install the intake manifold to the cylinder head sub-assembly with the 6 bolts.
| *A | w/o TCV |
| *B | w/ TCV |
Tighten the 6 bolts in the order shown in the illustration.
w/ TCV:
| *A | w/o TCV |
| *B | w/ TCV |
Connect the intake air control valve actuator (for TCV) connector.
Engage the 2 wire harness clamps.
Connect the engine wire with the bolt.
Install the wire harness clamp bracket to the intake manifold with the bolt.
Engage the 3 wire harness clamps.
Connect the fuel vapor feed hose to the intake manifold and slide the clip to secure it.
CONNECT UNION TO CONNECTOR TUBE HOSE (for LHD)
Connect the union to connector tube hose to the intake manifold and slide the clip to secure it.
CONNECT UNION TO CHECK VALVE HOSE (for RHD)
Connect the union to check valve hose to the intake manifold and slide the clip to secure it.
CONNECT NO. 2 VENTILATION HOSE
Connect the No. 2 ventilation hose to the intake manifold and slide the clip to secure it.
INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
INSTALL FUEL INJECTOR ASSEMBLY
INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY (for LHD)
INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY (for RHD)
INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY