PCV VALVE REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during PCV valve (ventilation valve sub-assembly) removal/installation are shown below.

Necessary Procedures After Parts Removed/Installed/Replaced
Replaced Part or Performed Procedure Necessary Procedures Effect/Inoperative Function when Necessary Procedure not Performed Link

  • Replacement of throttle body assembly

  • Cleaning the deposits from the throttle body assembly

  • Replacement of EGR valve assembly

  • Gas leak from exhaust system is repaired

Inspection After Repair
  • Poor idle, etc.

  • Engine start function, etc.

Click here (w/ Canister Pump Module)

Click here (w/o Canister Pump Module)

Note

This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.

Click here

PROCEDURE


  1. REMOVE INTAKE MANIFOLD

    Click here

  2. REMOVE PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)


    1. B006XO9

      Remove the PCV valve (ventilation valve sub-assembly) from the cylinder head sub-assembly.