PURGE VALVE(w/ Canister Pump Module) INSTALLATION

PROCEDURE


  1. INSTALL PURGE VALVE (PURGE VSV)


    1. B004OE8C01
      *1 No. 1 Fuel Vapor Feed Hose
      *2 No. 2 Fuel Vapor Feed Hose
      *a Up
      *b Front
      *c 120°
      *d 2 to 7 mm (0.0787 to 0.276 in.)

      Install the purge valve (purge VSV) to the purge VSV bracket with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the No. 2 fuel vapor feed hose to the purge valve (purge VSV).

    3. Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV) and slide the clip to secure it.

      Tech Tips

      Engage the clip within the area shown in the illustration.

    4. Connect the purge valve (purge VSV) connector.