CAUTION / NOTICE / HINT
CAUTION:
The engine assembly with transaxle is very heavy. Be sure to follow the procedure described in the repair manual, or the engine lifter may suddenly drop or the engine assembly with transaxle may fall off the engine lifter.
To prevent burns, do not touch the engine, exhaust manifold or other high temperature components while the engine is hot.
PROCEDURE
INSTALL ENGINE MOUNTING INSULATOR LH
Tech Tips
Perform this procedure only when replacement of the engine mounting insulator LH is necessary.
INSTALL ENGINE MOUNTING BRACKET SUB-ASSEMBLY LH
Tech Tips
Perform this procedure only when replacement of the engine mounting bracket sub-assembly LH is necessary.
Temporarily tighten the bolt (A), and then fully tighten the 4 bolts in the order of (B), (C), (D) and (A).
Note
Make sure that there is no gap between the engine mounting bracket sub-assembly LH and vehicle body before tightening the bolts.
INSTALL ENGINE MOUNTING SPACER
Tech Tips
Perform this procedure only when replacement of the engine mounting spacer is necessary.
Install the engine mounting spacer to the vehicle body with the 2 bolts.
Note
Temporarily tighten the bolt (A), and then fully tighten the 2 bolts in the order of (B) and (A).
INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH
Tech Tips
Perform this procedure only when replacement of the engine mounting insulator sub-assembly RH is necessary.
Install the engine mounting insulator sub-assembly RH to the engine mounting spacer and vehicle body with the nut and 2 bolts.
Note
Temporarily tighten the bolt (A), and then fully tighten the 2 bolts and nut in the order of (B), (A) and (C).
Engage the clamp.
Install the bracket to the engine mounting insulator sub-assembly RH with the bolt.
Install the radiator reserve tank assembly with the bolt and nut in the order shown in the illustration.
Engage the clamp.
INSTALL ENGINE HANGERS
REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
Remove the engine assembly from the engine stand.
INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
INSTALL FRONT ENGINE MOUNTING BRACKET
INSTALL REAR ENGINE MOUNTING INSULATOR
Tech Tips
Perform this procedure only when replacement of the rear engine mounting insulator is necessary.
INSTALL FRONT ENGINE MOUNTING INSULATOR
Tech Tips
Perform this procedure only when replacement of the front engine mounting insulator is necessary.
Install the front engine mounting insulator to the front frame assembly with the 3 nuts.
INSTALL FRONT FRAME ASSEMBLY
Install the rear engine mounting insulator to the front frame assembly with the 4 nuts.
Install the front engine mounting insulator to the front engine mounting bracket with the bolt.
REMOVE ENGINE HANGERS
INSTALL ENGINE WIRE
Connect all connectors and clamps, and install the engine wire to the engine assembly with transaxle.
CONNECT WATER BY-PASS HOSE ASSEMBLY
CONNECT NO. 1 WATER BY-PASS HOSE
INSTALL BREATHER PLUG HOSE
INSTALL STARTER ASSEMBLY
CONNECT VACUUM HOSE
INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
Using height adjustment attachments and plate lift attachments to keep the engine assembly with transaxle and front frame assembly level, set an engine lifter underneath the engine assembly with transaxle and front frame assembly.
Note
Do not perform any procedures while the engine assembly is suspended because doing so may cause the engine assembly to drop, resulting in injury. However, the engine assembly needs to be suspended when it is installed to or removed from an engine stand.
To prevent the engine assembly from unexpectedly moving, securely support the engine assembly until it is secured to an engine stand.
Operate the engine lifter and install the engine assembly with transaxle to the vehicle.
CAUTION:
Do not raise the engine assembly with transaxle more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.
Note
Make sure that the engine assembly with transaxle is clear of all wiring and hoses.
While raising the engine assembly with transaxle into the vehicle, do not allow it to contact the vehicle.
|
Bolt |
|
Nut |
Install the front bumper extension sub-assembly RH and front bumper extension sub-assembly LH to the front frame assembly and vehicle body with the 8 bolts.
Install the front suspension member bracket sub-assembly RH and front suspension member bracket sub-assembly LH to the front frame assembly and vehicle body with the 4 bolts and 2 nuts.
Install the engine mounting insulator LH to the engine mounting bracket sub-assembly LH with the bolt and nut.
Install the engine mounting insulator sub-assembly RH to the front No. 1 engine mounting bracket LH with the 3 bolts and nut.
Install the No. 2 engine mounting stay RH with the bolt and 2 nuts.
INSTALL DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT
INSTALL FLYWHEEL HOUSING UNDER COVER
Install the flywheel housing under cover with the 2 bolts.
INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET (for Upper Side)
Install the No. 1 exhaust pipe support bracket to the oil pan sub-assembly with the 2 bolts.
INSTALL FRONT DRIVE SHAFT ASSEMBLY
INSTALL EXHAUST MANIFOLD
CONNECT STEERING INTERMEDIATE SHAFT ASSEMBLY
CONNECT EARTH WIRE
Connect the earth wire to the vehicle body with the 2 bolts.
CONNECT ENGINE WIRE
Engage the 2 clamps and connect the engine wire to the vehicle body.
Connect the engine wire with the bolt.
Engage the 2 clamps.
Engage the claw and connect the engine wire to the engine room relay block and junction block assembly.
Install the nut to the engine room relay block and junction block assembly.
Connect the 4 connectors to the engine room relay block and junction block assembly.
Install the No. 2 relay block cover to the engine room relay block and junction block assembly.
CONNECT SUCTION HOSE SUB-ASSEMBLY
CONNECT NO. 1 COOLER REFRIGERANT DISCHARGE HOSE SUB-ASSEMBLY
CONNECT NO. 1 FUEL HOSE
Connect the No. 1 fuel hose (for Port Injection).
Connect the No. 1 fuel hose to the fuel pipe.
Connect the No. 1 fuel hose (for Direct Injection).
Connect the No. 1 fuel hose to the fuel pipe.
Install the No. 1 fuel pipe clamp to the fuel tube connector.
Engage the 2 claws to install the No. 2 fuel pipe clamp.
CONNECT OUTLET HEATER WATER HOSE
Connect the outlet heater water hose to the heater water pipe and slide the clip to secure it.
CONNECT INLET HEATER WATER HOSE
Connect the inlet heater water hose to the water outlet and slide the clip to secure it.
Engage the clamp.
CONNECT RADIATOR HOSE SUB-ASSEMBLY
Connect the radiator hose sub-assembly to the water outlet and slide the clip to secure it.
Install the radiator hose sub-assembly to the engine assembly with the 2 bolts.
CONNECT NO. 2 RADIATOR HOSE
Connect the No. 2 radiator hose to the water inlet and slide the clip to secure it.
CONNECT UNION TO CHECK VALVE HOSE
Connect the union to check valve hose to the brake booster assembly and slide the clip to secure it.
CONNECT NO. 1 FUEL VAPOR FEED HOSE
Connect the No. 1 fuel vapor feed hose to the No. 1 vacuum switching valve and slide the clip to secure it.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
| *a | Correct |
| *b | Incorrect |
Connect the transmission control cable assembly to the transmission control shaft lever as shown in the illustration.
Note
Before installing the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in N.
INSTALL BATTERY CLAMP SUB-ASSEMBLY
Install the battery clamp sub-assembly with the 3 bolts.
Engage the 5 clamps to the battery clamp sub-assembly.
INSTALL BATTERY
CONNECT ENGINE ROOM MAIN WIRE
Connect the engine wire with engine room main wire to the positive (+) battery terminal with the nut.
INSTALL ECM
INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
| *a | Protrusion |
| *b | Cutout |
| *c | Hose Clamp End |
| *d | 2.0 mm (0.0787 in.) |
| *e | Paint Mark |
Install the air cleaner assembly with air cleaner hose to the throttle body with motor assembly.
Note
Align the cutout of the air cleaner hose assembly with the protrusion of the throttle body with motor assembly.
Tighten the hose clamp in the position shown in the illustration.
Note
Make sure that the end of the hose clamp is positioned as shown in the illustration.
| *a | Air Cleaner Support |
Insert the 3 pins of the air cleaner assembly into the 3 air cleaner supports as shown in the illustration.
Note
Insert the 3 pins of the air cleaner assembly into the 3 air cleaner supports at the same time.
Check that the pins are securely inserted into air cleaner supports.
Engage the vacuum hose to the air cleaner hose.
Engage the 3 wire harness clamps.
Connect the mass air flow meter sub-assembly connector.
| *1 | No. 1 Fuel Vapor Feed Hose |
| *2 | No. 2 Ventilation Hose |
| *a | Top |
| *b | Paint Mark |
| *c | Rear of Vehicle |
| *d | 180° (Claw of Clip Location) |
Connect the No. 2 ventilation hose to the air cleaner hose and slide the clip to secure it.
Note
Make sure that the condition of the clip is as shown in the illustration.
Engage the 2 clamps to connect the No. 1 fuel vapor feed hose to the air cleaner hose.
INSTALL INLET AIR CLEANER ASSEMBLY
Install the inlet air cleaner assembly with the 2 bolts in the order shown in the illustration.
INSTALL V-BANK COVER SUB-ASSEMBLY
Engage the 4 clips in the order shown in the illustration to install the V-bank cover sub-assembly.
Note
Make sure that the clips are engaged securely.
Do not subject the clips to shock or apply excessive force to the clips when engaging them or they may be damaged.
If the clips are not engaged in the order shown in the illustration, the V-bank cover sub-assembly may be damaged.
INSPECT VACUUM HOSES
Inspect the vacuum hoses.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
ADD ENGINE OIL
ADD ENGINE COOLANT
ADD AUTOMATIC TRANSAXLE FLUID
CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
WARM UP ENGINE
INSPECT SHIFT LEVER POSITION
ADJUST SHIFT LEVER POSITION
INSPECT FOR ENGINE OIL LEAK
INSPECT FOR COOLANT LEAK
INSPECT FOR REFRIGERANT LEAK
INSPECT FOR FUEL LEAK
INSPECT FOR EXHAUST GAS LEAK
CHECK ENGINE OIL LEVEL
INSPECT ENGINE COOLANT LEVEL IN RESERVOIR TANK
INSTALL FRONT LOWER BUMPER ABSORBER
Engage the 2 claws to the front lower bumper absorber.
Install the 4 bolts.
INSTALL FRONT BUMPER COVER
INSTALL FRONT FENDER APRON SEAL LH
Install the front fender apron seal LH with the 2 screws and clip.
INSTALL FRONT FENDER APRON SEAL RH
Install the front fender apron seal RH with the 2 screws and clip.
INSTALL NO. 1 ENGINE UNDER COVER
Install the No. 1 engine under cover with the bolt, 6 screws and 2 clips.
INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
Install the front wheel opening extension pad LH with the 3 screws.
INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
Install the front wheel opening extension pad RH with the 3 screws.
INSTALL FRONT WHEELS
ALIGN FRONT WHEELS FACING STRAIGHT AHEAD
INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
PERFORM INITIALIZATION
INSPECT IGNITION TIMING
INSPECT ENGINE IDLE SPEED
INSPECT CO/HC
CHECK FOR SPEED SENSOR SIGNAL