ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the 2 bolts and nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. B006WTE

      Connect the 3 ECM connectors and rotate the 3 levers to lock them.

      Note


      • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water and other foreign matter.

      • Be sure to securely connect the ECM connectors.

  4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

    Click here

  5. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  6. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here

  7. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Click here

  9. PERFORM INITIALIZATION