PROCEDURE
INSPECT NO. 1 ELECTRONIC FUEL INJECTION MAIN RELAY (EFI-MAIN NO. 1)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 1 electronic fuel injection main relay (EFI-MAIN NO. 1).
INSPECT NO. 2 ELECTRONIC FUEL INJECTION MAIN RELAY (EFI-MAIN NO. 2)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 2 electronic fuel injection main relay (EFI-MAIN NO. 2).
INSPECT EFI CIRCUIT OPENING RELAY ASSEMBLY (C/OPN)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the EFI circuit opening relay assembly (C/OPN).
INSPECT NO. 2 IGNITION RELAY (IG2 NO. 1)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the No. 2 ignition relay (IG2 NO. 1).