PARK / NEUTRAL POSITION SWITCH INSTALLATION

PROCEDURE


  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Temporarily install the park/neutral position switch assembly to the automatic transaxle case sub-assembly with the 2 bolts.

      Note

      Before installing the park/neutral position switch assembly, remove any dirt or rust on the manual valve lever shaft sub-assembly. Be sure to install the park/neutral position switch assembly straight along the manual valve lever shaft sub-assembly while being careful not to deform the plate spring that supports the manual valve lever shaft sub-assembly. If the plate spring is deformed, the park/neutral position switch assembly cannot be installed correctly.

    2. Temporarily install the transmission control shaft lever to the park/neutral position switch assembly.

    3. B006X5WC01
      *a P
      *b N

      Turn the transmission control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.

    4. Remove the transmission control shaft lever from the park/neutral position switch assembly.

    5. B0070PQC01
      *a Neutral Basic Line
      *b Protrusion

      Align the protrusion with the neutral basic line.

    6. Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    7. Install the transmission control shaft lever to the manual valve lever shaft sub-assembly with the washer and nut.

      Torque:
      12.7 N*m  { 130 kgf*cm, 9 ft.*lbf }
    8. Connect the park/neutral position switch assembly connector.

  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


    1. B006WXOC01
      *a Correct
      *b Incorrect

      Connect the transmission control cable assembly to the transmission control shaft lever as shown in the illustration.

      Note

      Before connecting the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in N.

  3. INSTALL BATTERY CLAMP SUB-ASSEMBLY

    Click here

  4. INSTALL ECM

    Click here

  5. INSTALL BATTERY

    Click here

  6. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION

    Click here

  7. INSPECT SHIFT LEVER POSITION

    Click here

  8. ADJUST SHIFT LEVER POSITION

    Click here