INTEGRATION RELAY INSTALLATION

PROCEDURE


  1. INSTALL SEMICONDUCTOR PWR INTEGRATION ECU


    1. Connect the 5 connectors.

    2. A01OB59

      Engage the 2 claws to install the semiconductor pwr integration ECU as shown in the illustration.

  2. INSTALL NO. 1 RELAY BLOCK COVER


    1. Engage the 3 claws to install the No. 1 relay block cover.

    2. Engage the 2 clamps.

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Click here

  4. INSTALL BATTERY SERVICE HOLE COVER LH

    Click here