POWER SWITCH INSPECTION

PROCEDURE


  1. INSPECT POWER SWITCH


    1. A01ODDOC10
      *a

      Component without harness connected

      (Power Switch)

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition

      5 (SS1) - 6 (AGND)

      1 (SS2) - 6 (AGND)

      Not pushed 10 kΩ or higher
      Pushed Below 1 Ω

      If the result is not as specified, replace the power switch.

    2. Apply auxiliary battery voltage between the terminals of the power switch, and check the illumination condition of the power switch indicator light.

      OK
      Condition Specified Condition

      Auxiliary battery positive (+) → Terminal 9 (SWIL)

      Auxiliary battery negative (-) → Terminal 6 (AGND)

      Illuminates

      Tech Tips


      • If the positive (+) lead and the negative (-) lead are incorrectly connected, the power switch indicator light will not illuminate.

      • If the voltage is too low, the power switch indicator light will not illuminate.

      If the result is not as specified, replace the power switch.