PROCEDURE
INSPECT SOLENOID (SL) VALVE
| *a | Component without harness connected (Solenoid (SL) Valve) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid (SL) valve.
Connect a positive (+) lead from the battery to the terminal of the solenoid (SL) valve connector and a negative (-) lead to the solenoid (SL) valve body, and check the operation of the solenoid (SL) valve.
Note
When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.
| OK |
|---|
| The valve moves and makes an operating sound. |
If the result is not as specified, replace the solenoid (SL) valve.
INSPECT SOLENOID (SLT) VALVE
| *a | Component without harness connected (Solenoid (SLT) Valve) |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the solenoid (SLT) valve.
Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid (SLT) valve connector, and check the operation of the solenoid (SLT) valve.
Note
When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.
| OK |
|---|
| The valve moves and makes an operating sound. |
If the result is not as specified, replace the solenoid (SLT) valve.
INSPECT SOLENOID (SLU) VALVE
Tech Tips
Refer to Inspect Solenoid (SLT) valve.
INSPECT SOLENOID (SL1) VALVE
Tech Tips
Refer to Inspect Solenoid (SLT) valve.
INSPECT SOLENOID (SL2) VALVE
Tech Tips
Refer to Inspect Solenoid (SLT) valve.
INSPECT SOLENOID (SL3) VALVE
Tech Tips
Refer to Inspect Solenoid (SLT) valve.
INSPECT SOLENOID (SL4) VALVE
Tech Tips
Refer to Inspect Solenoid (SLT) valve.