| DTC Code | DTC Name |
|---|---|
| P0617 | Starter Relay Circuit High |
DESCRIPTION
When the engine is started by stop and start control, the engine stop and start ECU controls the starter assembly by activating the ST relay (for starter pinion operation) via voltage from terminal STA and then, using its built-in starter delay circuit, activating the ST NO. 2 relay (for starter motor operation) via voltage from terminal STA2.
If overcurrent is detected in the starter relay circuit, the engine stop and start ECU stores DTC P0617 and blinks the stop and start cancel indicator light.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | Warning Indicate | Memory |
|---|---|---|---|---|---|
| P0617 | Starter Relay Circuit High | Both of the following conditions are met for 1 second (1 trip detection logic):
|
|
Blinks | DTC stored |
CONFIRMATION DRIVING PATTERN
Tech Tips
DTCs for the stop and start system are not cleared even if the malfunction has been repaired. After repairing the malfunction, be sure to clear the DTCs.
Tech Tips
If the cable is disconnected from the negative (-) battery terminal, stop and start control is prohibited until refresh charge is completed. In this case, drive the vehicle approximately 5 to 60 minutes until refresh charge is completed and stop and start control operation is permitted.
Allow the engine to idle for 3 minutes after it is warmed up and check that the engine idle speed is within 50 rpm of the target idle speed.
CONFIRMATION AFTER TROUBLESHOOTING
Connect the GTS to the DLC3.
Turn the engine switch on (IG) and turn the GTS on.
Clear the DTCs.
Start the engine and warm it up.
Drive the vehicle at 7 km/h (4.3 mph) or more.
CAUTION:
When performing Confirmation Driving Pattern, obey all speed limits and traffic laws.
Depress the brake pedal and stop the vehicle.
Keep the engine stopped by stop and start control for 1 second or more. (Keep the shift lever in D.)
Release the brake pedal with the shift lever in D to start the engine.
Check that DTCs are not output.
STOP AND START SYSTEM OPERATION CHECK
Tech Tips
If the cable is disconnected from the negative (-) battery terminal, stop and start control is prohibited until refresh charge is completed. In this case, drive the vehicle approximately 5 to 60 minutes until refresh charge is completed and stop and start control operation is permitted.
Start the engine and warm it up.
Turn the air conditioning system off.
Drive the vehicle at 7 km/h (4.3 mph) or more.
CAUTION:
When performing Confirmation Driving Pattern, obey all speed limits and traffic laws.
Depress the brake pedal and stop the vehicle.
Allow the engine to stop by stop and start control. (Keep the shift lever in D.)
Release the brake pedal with the shift lever in D to start the engine.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
Before replacing the engine stop and start ECU, read the number of starter operations and total number of engine starts and write it into a new engine stop and start ECU.
After replacing the engine stop and start ECU or air conditioning amplifier assembly, reset and perform learning of the air conditioning information in the engine stop and start ECU.
After replacing the engine stop and start ECU, airbag sensor assembly*1 or yaw rate and acceleration sensor*2, clear and calibrate the deceleration sensor zero point in the engine stop and start ECU.
*1: for Optitron Meter Type
*2: for TFT Meter Type
Inspect the fuses for circuits related to this system before performing the following procedure.
Tech Tips
Using the GTS, read the freeze frame data before troubleshooting. System condition information is recorded as freeze frame data the moment a DTC is stored. This information can be useful when troubleshooting.
PROCEDURE
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - BBC FUSE)
Disconnect the A65 engine stop and start ECU connector.
Remove the BBC NO. 1 and BBC NO. 2 fuses from the No. 1 engine room relay block and No. 1 junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - ST, ST NO. 2 RELAY)
Disconnect the A66 and A65 engine stop and start ECU connectors.
Remove the ST and ST NO. 2 relays from the No. 1 engine room relay block and No. 1 junction block assembly.
Remove the BBC NO. 1 and BBC NO. 2 fuses from the No. 1 engine room relay block and No. 1 junction block assembly.
Disconnect the A74 certification ECU (smart key ECU assembly) connector.
Disconnect the D15 park/neutral position switch assembly connector.
Disconnect the A46 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK ENGINE STOP AND START ECU
Disconnect the engine stop and start ECU connector.
| *a | Component without harness connected (Engine Stop and Start ECU) |
- | - |
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPLACE ENGINE STOP AND START ECU Click here |
| OK |
|
INSPECT RELAY (ST, ST NO. 2 RELAY)
Inspect the ST relay.
Inspect the ST NO. 2 relay.
| Result | |||
|---|---|---|---|
|
| OK |
|
USE SIMULATION METHOD TO CHECK Click here |
| NG |
|
REPLACE RELAY (ST, ST NO. 2 RELAY) |