STARTER INSTALLATION

PROCEDURE


  1. INSTALL STARTER ASSEMBLY


    1. Install the starter assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    2. Connect terminal 30 with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Install the terminal cap.

    4. Connect the starter assembly connector.

    5. Connect the wire harness with the 2 bolts.

      Torque:
      19.1 N*m  { 195 kgf*cm, 14 ft.*lbf }
  2. INSTALL AIR CLEANER BRACKET


    1. Install the air cleaner bracket with the 2 bolts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
  3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

    Click here

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

    Click here

  6. INSTALL BATTERY


    1. Install the battery clamp bolt to the battery carrier.

    2. Install the battery and battery tray.

    3. w/ Battery Insulator:


      1. Install the battery insulator.

    4. Install the battery clamp sub-assembly with the bolt and nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    5. Connect the cable to the positive (+) battery terminal and tighten the nut.

      Torque:
      5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
    6. Engage the 2 claws to close the battery terminal cap.

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  8. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  9. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here