PROCEDURE
INSTALL TIMING CHAIN COVER ASSEMBLY
Apply a light coat of engine oil to 2 new oil pump gaskets and a new oil hole cover gasket.
| *1 | Oil Pump Gasket |
| *2 | Oil Hole Cover Gasket |
Install the 2 oil pump gaskets and oil hole cover gasket to the stiffening crankcase assembly.
| *1 | Crankshaft Timing Sprocket |
| *a | Drive Rotor Spline |
Align the drive rotor spline and the crankshaft timing sprocket as shown in the illustration.
Apply seal packing in a line to the timing chain cover assembly as shown in the following illustration.
| *a | 7.0 mm (0.276 in.) or more | *b | 3.0 mm (0.118 in.) or more |
| *c | 13 mm (0.512 in.) or more | *d | 28 mm (1.10 in.) |
| *e | 25 mm (0.984 in.) | *f | 26 mm (1.02 in.) |
| *g | 3.0 mm (0.118 in.) | *h | 2.5 to 3.5 mm (0.0984 to 0.138 in.) |
| *i | 2.5 mm (0.0984 in.) | *j | 5.0 mm (0.197 in.) |
| *k | 7.0 mm (0.276 in.) | - | - |
| Seal Packing |
|---|
| Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent |
| Seal Packing Application Chart | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Note
Clean the surfaces with non-residue solvent before applying seal packing.
Install the timing chain cover assembly within 3 minutes and tighten the bolts within 10 minutes of applying seal packing.
Do not add engine oil for at least 2 hours after installation.
Do not start the engine for at least 2 hours after installation.
Temporarily install the timing chain cover assembly with the 2 nuts and 19 bolts.
| *a | Torque | *b | Tightening Order |
|
Bolt | |
Nut |
| Bolt Length | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Note
Make sure there is no oil on the bolts. If oil is found on any bolt, clean it before installation.
Tighten the 19 bolts and 2 nuts in several steps, in the order shown in the illustration.
INSTALL ENGINE MOUNTING BRACKET RH
INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL
INSTALL CRANKSHAFT POSITION SENSOR
INSTALL CRANKSHAFT PULLEY ASSEMBLY
INSTALL IDLER PULLEY SUB-ASSEMBLY
INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY
INSTALL V-RIBBED BELT
INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
CONNECT NO. 2 VACUUM TRANSMITTING HOSE ASSEMBLY
CONNECT VACUUM TRANSMITTING HOSE ASSEMBLY
INSTALL FUEL PUMP PROTECTOR
INSTALL NO. 2 VENTILATION HOSE
TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY (for High Pressure)
INSTALL FUEL PUMP ASSEMBLY (for High Pressure)
INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY (for High Pressure)
INSTALL NO. 2 WATER BY-PASS PIPE
CONNECT ENGINE WIRE
INSTALL IGNITION COIL ASSEMBLY
REMOVE ENGINE ASSEMBLY FROM ENGINE STAND