ACTIVE CONTROL ENGINE MOUNT INSTALLATION

PROCEDURE


  1. INSTALL FRONT ENGINE MOUNTING INSULATOR


    1. Install the front engine mounting insulator with the 3 nuts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
    2. Install the hole plug.

  2. INSTALL FRONT ENGINE MOUNTING BRACKET


    1. A01VXWFN01

      Install the front engine mounting bracket with the 4 bolts.

      Torque:
      Bolt (A)
      87 N*m  { 887 kgf*cm, 64 ft.*lbf }
      Bolt (B)
      64 N*m  { 653 kgf*cm, 47 ft.*lbf }
    2. Engage the 2 wire harness clamps.

  3. INSTALL VACUUM SWITCHING VALVE ASSEMBLY

    Click here

  4. INSTALL TRANSMISSION OIL COOLER