AIR CONDITIONING SYSTEM IG Power Source Circuit

DESCRIPTION

The main power source is supplied to the air conditioning amplifier assembly when the engine switch is on (IG).

The power is used for operating the air conditioning amplifier assembly, servo motors, etc.

WIRING DIAGRAM

A01Q9EPE14

CAUTION / NOTICE / HINT

Note


  • Inspect the fuses for circuits related to this system before performing the following inspection procedure.

  • Before disconnecting the cable from the negative (-) battery terminal or replacing the air conditioning amplifier assembly, record the last operation state of the air conditioning for each transmitter. After replacement, it is necessary to perform memory registration for each transmitter.

    Click here

PROCEDURE


  1. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER ASSEMBLY - BATTERY)


    1. Disconnect the K64 air conditioning amplifier assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      K64-5 (IG+) - Body ground Engine switch off Below 1 V
      K64-5 (IG+) - Body ground Engine switch on (IG) 11 to 14 V
      Result
      Proceed to
      OK
      NG

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER ASSEMBLY - BODY GROUND)


    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      K64-1 (GND) - Body ground Always Below 1 Ω
      Result
      Proceed to
      OK
      NG

    OK
    NG