NETWORK GATEWAY ECU INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for RHD and LHD vehicles.

  • The procedure listed below is for LHD vehicles.

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. B002EBA

      Engage the guides to install the network gateway ECU.

    2. Install the 2 screws.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    3. Connect the connector.

  2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

    Click here

  3. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

    Click here

  4. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

    Click here

  5. INSTALL INSTRUMENT CENTER CLUSTER FINISH PANEL SUB-ASSEMBLY

    Click here

  6. INSTALL INSTRUMENT SIDE PANEL RH

    Click here

  7. INSTALL FRONT DOOR OPENING TRIM COVER RH

    Click here

  8. INSTALL FRONT DOOR SCUFF PLATE RH

    Click here

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Click here

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here