BLIND SPOT MONITOR SENSOR INSTALLATION

PROCEDURE


  1. INSTALL BLIND SPOT MONITOR SENSOR LH


    1. Install the blind spot monitor sensor LH with the 3 nuts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Replace the blind spot monitor sensor LH if it has been dropped or subjected to a severe impact.

    2. Connect the connector.

  2. INSTALL BLIND SPOT MONITOR SENSOR RH

    Tech Tips

    Use the same procedure as for the LH side.

  3. INSTALL REAR BUMPER ASSEMBLY

    Click here

  4. PERFORM BLIND SPOT MONITOR BEAM AXIS CONFIRMATION

    Click here

    SST
    09870-60000   ( 09870-60010 )
    09870-60040