NOISE FILTER INSTALLATION

PROCEDURE


  1. INSTALL RADIO SETTING CONDENSER (for High Mounted Stop Light)


    1. A01XQ1P

      Engage the claw to install 2 new terminal covers to the wire harness.

    2. B002DN5

      Engage the clamp to temporarily install the radio setting condenser with wire harness.

    3. Install the radio setting condenser with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    4. A01XRDT

      Engage the claws to install the terminal cover with wire harness to the radio setting condenser.

  2. INSTALL RADIO SETTING CONDENSER (for Window Defogger)


    1. A01XPXR

      Engage the claw to install a new terminal cover to the wire harness.

    2. A01XQGH

      Engage the claws to install the new terminal cover with wire harness to a radio setting condenser.

    3. B002DQR

      Engage the clamp to temporarily install a radio setting condenser with wire harness to the quarter.

    4. Install the radio setting condenser with the bolt.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
  3. INSTALL PACKAGE TRAY TRIM PANEL ASSEMBLY

    Click here