FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE


  1. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL


    1. Apply MP grease to the lip of a new timing chain case or timing chain case oil seal.

    2. B002DPIC01
      *a Oil Seal Protrusion Height

      Using SST and a hammer, tap in the timing chain case or timing chain case oil seal until its surface is flush with the timing chain cover assembly edge.

      SST
      09506-35010
      Oil Seal Protrusion Height
      -0.5 to 0.5 mm (-0.0197 to 0.0197 in.) (From the edge of the timing chain cover assembly)

      Note


      • Keep the lip free from foreign matter.

      • Do not tap in the timing gear case or timing chain case oil seal at an angle.

      • Do not tap in the timing gear case or timing chain case oil excessively.

  2. INSTALL CRANKSHAFT TIMING GEAR KEY


    1. Install the crankshaft timing gear key to the crankshaft groove.

  3. INSTALL CRANKSHAFT PULLEY


    1. Align the crankshaft timing gear key with the key groove of the crankshaft pulley, and slide on the crankshaft pulley.

    2. B002C6SC01
      *a Hold
      *b Turn

      Using SST, hold the crankshaft pulley and install the crankshaft pulley set bolt.

      SST
      09213-38010   ( 09214-00011 )
      09330-00021
      Torque:
      330 N*m  { 3365 kgf*cm, 243 ft.*lbf }
  4. INSTALL FAN AND GENERATOR V BELT

    Click here

  5. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY

    Click here

  6. INSTALL RADIATOR RESERVE TANK ASSEMBLY

    Click here

  7. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

    Click here

  8. CONNECT VENTILATION HOSE

    Click here

  9. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  10. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here