DESCRIPTION
When the engine switch is turned on (IG), battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes current to flow to the coil of the No. 1 integration relay (EFI MAIN relay), closing the contact and supplying power to terminals +B and +B2 of the ECM.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
Inspect the fuses for circuits related to this system before performing the following procedure.
PROCEDURE
CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY)
| *a | Front view of wire harness connector (to No. 1 integration relay) |
Remove the No. 1 integration relay from No. 2 engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY) |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY)
Remove the No. 1 integration relay from No. 2 engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN, IG2 RELAY)
Inspect the No. 1 integration relay (EFI MAIN, IG2 relay).
| Result | |||
|---|---|---|---|
|
| NG |
|
REPLACE NO. 1 INTEGRATION RELAY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY)
Disconnect the A12 ECM connector.
Remove the No. 1 integration relay from No. 2 engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the E3 ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT ECM (IGSW VOLTAGE)
| *a | Component with harness connected (ECM) |
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE ECM Click here |
| NG |
|
CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY)
Disconnect the A12 ECM connector.
Remove the No. 1 integration relay from No. 2 engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - NO. 1 INTEGRATION RELAY)
Disconnect the A21 certification ECU (smart key ECU assembly) connector.
Remove the No. 1 integration relay from No. 2 engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
GO TO ENTRY AND START SYSTEM Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |