SCAVENGING PUMP INSTALLATION

PROCEDURE


  1. INSTALL SCAVENGING PUMP ASSEMBLY


    1. Temporarily install the scavenging pump assembly and a new gasket with the 6 bolts.

    2. B002D78N04

      Using several steps, uniformly install and tighten the 6 bolts in the order shown in the illustration.

      Torque:
      23 N*m  { 235 kgf*cm, 17 ft.*lbf }
  2. INSTALL NO. 3 OIL PIPE


    1. Install a new O-ring to the No. 3 oil pipe.

    2. Connect the No. 3 oil pipe to the scavenging pump assembly and align the bolt holes.

      Note


      • Do not damage the O-ring.

      • Do not rotate the No. 3 oil pipe when connecting it to the scavenging pump assembly.

    3. Install the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL NO. 2 OIL PIPE


    1. Install a new O-ring and new oil pipe seal to the No. 2 oil pipe.

    2. Connect the No. 2 oil pipe to the scavenging pump assembly and align the bolt holes.

      Note


      • Do not damage the O-ring.

      • Do not rotate the oil pipe when connecting it to the scavenging pump assembly.

    3. Install the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  4. INSTALL NO. 1 OIL PIPE


    1. Install a new O-ring and new oil pipe seal to the No. 1 oil pipe.

    2. Connect the No. 1 oil pipe to the scavenging pump assembly and align the bolt holes.

      Note


      • Do not damage the O-ring.

      • Do not rotate the oil pipe when connecting it to the scavenging pump assembly.

    3. Install the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  5. INSTALL TIMING CHAIN COVER ASSEMBLY

    Click here