PROCEDURE
INSTALL LEAK DETECTION PUMP SUB-ASSEMBLY
Engage the 2 claws to install a new leak detection pump sub-assembly to the canister (charcoal canister assembly).
Note
Do not allow foreign matter such as grease, oil or water to adhere to the O-rings.
Ensure that the claws are engaged properly.
INSTALL CHARCOAL CANISTER BASE BRACKET
Engage the claw to install the charcoal canister base bracket.
INSTALL CANISTER (CHARCOAL CANISTER ASSEMBLY)
Install the canister (charcoal canister assembly) with the 3 nuts and clip.
| *a | Retainer |
Push the air line tube onto the canister (charcoal canister assembly) and push in the retainer to engage the lock claws.
Note
Check that there are no scratches or foreign matter around the connecting parts of the tube connector and pipe canister (charcoal canister assembly) before performing this work.
After connecting the air line tube, check that the air line tube is securely connected by pulling on the tube connector.
Install the purge line hose to the canister (charcoal canister assembly) and slide the 2 clips to secure them.
| *a | Retainer |
Push the vent line hose onto the canister (charcoal canister assembly) and push in the retainer to engage the lock claws.
Note
Check that there are no scratches or foreign matter around the connecting parts of the tube connector and pipe (canister (charcoal canister assembly)) before performing this work.
After connecting the vent line hose, check that the vent line hose is securely connected by pulling on the tube connector.
Connect the leak detection pump sub-assembly connector.
Engage the 4 wire harness clamps to the canister (charcoal canister assembly).
INSTALL NO. 1 FLOOR UNDER COVER ASSEMBLY