CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
Note
When installing new roof drip side finish moulding clips, remove any double-sided tape remaining where the roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.
| *a | Adhesive |
| *b | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to each new roof drip side finish moulding clip.
Tech Tips
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
Install the roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the roof drip side finish moulding clips.
| Standard Measurement | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Install the roof drip side finish moulding when 40 minutes or more have elapsed since the roof drip side finish moulding clips were installed.
Tech Tips
Initial hardening time: 40 minutes
Complete hardening time: 24 hours
INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING
Engage the 2 clips to install the center roof drip side finish moulding as shown in the illustration.
| Standard Measurement | ||||||||
|---|---|---|---|---|---|---|---|---|
|