HORN INSTALLATION

PROCEDURE


  1. INSTALL LOW PITCHED HORN ASSEMBLY


    1. Install the low pitched horn assembly with the bolt.

      Torque:
      23 N*m  { 235 kgf*cm, 17 ft.*lbf }
    2. Connect the connector.

  2. INSTALL NO.1 RADIATOR TO SUPPORT SEAL

    Click here

  3. INSTALL NO.1 RADIATOR GRILLE RETAINER

    Click here

  4. INSTALL FRONT BUMPER ASSEMBLY

    Click here