DESCRIPTION
The main body ECU (multiplex network body ECU) controls the daytime running lights.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
Inspect the fuses for circuits related to this system before performing the following procedure.
Before replacing the main body ECU (multiplex network body ECU), refer to Service Bulletin.
PROCEDURE
CHECK OPERATION (CLEARANCE LIGHTS)
Check the operation of the clearance lights.
| OK |
|---|
| The clearance lights operate normally. |
| Result | |||
|---|---|---|---|
|
| NG |
|
GO TO PROBLEM SYMPTOMS TABLE Click here |
| OK |
|
PERFORM ACTIVE TEST USING GTS
Connect the GTS to the DLC3.
Turn the power switch to on (IG).
Turn the GTS on.
Enter the following menus: Body Electrical / Main Body / Active Test.
Perform the Active Test according to the display on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| Daytime Running Light | Daytime running lights | ON or OFF | - |
| Tester Display |
|---|
| Daytime Running Light |
| OK |
|---|
| The daytime running lights illuminate. |
| Result | |||
|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| NG |
|
INSPECT NO. 1 INTEGRATION RELAY (P-CON RELAY)
Remove the No. 1 integration relay from the No. 1 engine room relay block.
Inspect the No. 1 integration relay.
| OK |
|---|
| No. 1 integration relay is normal. |
| Result | |||
|---|---|---|---|
|
| NG |
|
REPLACE NO. 1 INTEGRATION RELAY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY (P-CON RELAY) - AUXILIARY BATTERY)
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - HEADLIGHT ASSEMBLY LH AND HEADLIGHT ASSEMBLY RH)
Disconnect the A11 headlight assembly LH connector.
Disconnect the A29 headlight assembly RH connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
Disconnect the 3F instrument panel junction block assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
Remove the instrument panel junction block assembly.
for LHD: Click here
for RHD: Click here
Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Measure the resistance according to the value(s) in the table below.
| *a | Component without harness connected (Instrument Panel Junction Block Assembly) |
- | - |
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
|
| A |
|
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) Click here |
| B |
|
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) Click here |
| C |
|
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY Click here |
| D |
|
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY Click here |