| DTC Code | DTC Name |
|---|---|
| C1311 | Open Circuit in Main Relay 1 |
| C1312 | Short Circuit in Main Relay 1 |
DESCRIPTION
The main relay supplies power to the switching solenoid and the linear solenoid.
The main relay remains on for approximately 2 minutes after the power switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to operate.
| DTC No. | Detection Item | INF Code | DTC Detection Condition | Trouble Area | Note |
|---|---|---|---|---|---|
| C1311 | Open Circuit in Main Relay 1 | 1 | Either of the following is detected:
|
|
Electronically controlled brake system DTC |
| C1312 | Short Circuit in Main Relay 1 | 2 | The BS terminal voltage is 3.5 V or more for 4.5 seconds or more, when operation of the main relay is requested. |
|
Electronically controlled brake system DTC |
| Vehicle Condition | |||
|---|---|---|---|
| Pattern 1 | Pattern 2 | ||
| Diagnosis Condition | When the power switch is on (READY), the IG1 terminal voltage is 9.5 V or more. | ○ | - |
| When the power switch is off. | - | ○ | |
| Malfunction Status | The BS terminal voltage is less than 3.5 V, when operation of the main relay is requested. | ○ | - |
| The BS terminal voltage is less than 3.5 V, when operation of the main relay is requested. | - | ○ | |
| Detection Time | 0.05 seconds or more | 0.05 seconds or more | |
| Number of Trips | 1 trip | 1 trip | |
Tech Tips
DTC will be output when conditions for either of the patterns in the table above are met.
CAUTION / NOTICE / HINT
Note
After replacing the skid control ECU (brake booster with master cylinder assembly), perform linear solenoid valve offset learning, ABS holding solenoid valve learning, yaw rate and acceleration sensor zero point calibration and system information memorization after performing "Reset Memory".
Inspect the fuses for circuits related to this system before performing the following procedure.
PROCEDURE
PERFORM ACTIVE TEST USING GTS (MAIN RELAY)
Select the Active Test on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| ECB Main Relay | Main relay | Relay ON/OFF | ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
Select the Data List on the GTS.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| ECB Main Relay | Main relay operation request | ON or OFF | ON: Relay on OFF: Relay off |
ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
Check that the condition of the main relay observed on the GTS changes according to GTS operation.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
CHECK HARNESS AND CONNECTOR (+BI TERMINAL) Click here |
| A |
|
CHECK HARNESS AND CONNECTOR (BS TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
| OK |
|---|
| The connector is securely connected. |
Disconnect the A39 skid control ECU (brake booster with master cylinder assembly) connector.
Check both the connector case and the terminals for deformation and corrosion.
| OK |
|---|
| No deformation or corrosion. |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BS CIRCUIT) |
| OK |
|
RECONFIRM DTC
Reconnect the A39 skid control ECU (brake booster with master cylinder assembly) connector.
Clear the DTCs.
Turn the power switch off.
Turn the power switch on (IG).
Check if the same DTC is output.
| Result | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| A |
|
USE SIMULATION METHOD TO CHECK Click here |
| B |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
| C |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
CHECK HARNESS AND CONNECTOR (+BI TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
| OK |
|---|
| The connector is securely connected. |
Disconnect the A39 skid control ECU (brake booster with master cylinder assembly) connector.
Check both the connector case and the terminals for deformation and corrosion.
| OK |
|---|
| No deformation or corrosion. |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (+BI CIRCUIT) |
| OK |
|
CHECK HARNESS AND CONNECTOR (BS TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| Result | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| A |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
| B |
|
REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY Click here |
| C |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BS CIRCUIT) |