VEHICLE STABILITY CONTROL SYSTEM ABS Warning Light Remains ON

DESCRIPTION

The skid control ECU (brake actuator assembly) is connected to the combination meter assembly via CAN communication.

If any of the following is detected, the ABS warning light remains on:


Tech Tips

In some cases, the GTS cannot be used when the skid control ECU (brake actuator assembly) is abnormal.

WIRING DIAGRAM

A01W03ME16

CAUTION / NOTICE / HINT

Note


  • When replacing the skid control ECU (brake actuator assembly), perform zero point calibration and store system information Click here.

  • Inspect the fuses for circuits related to this system before performing the following inspection procedure (w/o Stop and Start System).

PROCEDURE


  1. CHECK CAN COMMUNICATION SYSTEM


    1. Check if CAN communication system DTCs are output (See page for with Central Gateway ECU, Click here for without Central Gateway ECU).

      Result
      Result Proceed to
      DTCs are not output. A
      DTCs are output (w/ Central Gateway ECU). B
      DTCs are output (w/o Central Gateway ECU). C

    B
    C
    A
  2. CHECK IF BRAKE ACTUATOR ASSEMBLY CONNECTOR IS SECURELY CONNECTED


    1. Check if the skid control ECU (brake actuator assembly) connector is securely connected.

      OK
      The connector is securely connected.

    NG
    OK
  3. INSPECT BATTERY


    1. Check the battery voltage.

      Standard Voltage
      11 to 14 V
      Result
      Result Proceed to
      Proper ECM is installed. A
      Proper ECM are not installed (for 2AR-FE). B
      Proper ECM are not installed (for 2GR-FE). C
      Proper ECM are not installed (for 6AR-FSE). D

    B
    C
    D
    A
  4. CHECK HARNESS AND CONNECTOR (IG1 TERMINAL)


    1. A01W4G2E03
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Skid Control ECU (Brake Actuator Assembly))

      Disconnect the A40 skid control ECU (brake actuator assembly) connector.

    2. Turn the engine switch on (IG).

    3. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      A40-12 (IG1) - Body ground Engine switch on (IG) 10.5 to 16 V
      Result
      Result Proceed to
      OK A
      NG (w/o Stop and Start System) B
      NG (w/ Stop and Start System) C

    B
    C
    A
  5. CHECK HARNESS AND CONNECTOR (GND1 TERMINAL)


    1. A01W4GYE02
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Skid Control ECU (Brake Actuator Assembly))

      Turn the engine switch off.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A40-25 (GND1) - Body ground Always Below 1 Ω

    NG
    OK
  6. READ VALUE USING GTS (ABS WARNING LIGHT)


    1. Reconnect the A40 skid control ECU (brake actuator assembly) connector.

    2. Connect the GTS to the DLC3.

    3. Turn the engine switch on (IG).

    4. Turn the GTS on.

    5. Select the Data List using the GTS Click here.

      ABS/VSC/TRC
      Tester Display Measurement Item/Range Normal Condition Diagnostic Note
      ABS Warning Light ABS warning light / ON or OFF

      ON: Warning light on

      OFF: Warning light off

      -
    6. Check the GTS display condition of the ABS warning light.

      Result
      Result Proceed to
      Display of the Data List remains ON. A
      Display of the Data List remains OFF. B

      Tech Tips

      If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next step before replacing parts Click here.


    A
    B