OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL TRANSMISSION OIL COOLER


    1. A01W569E02

      Temporarily install the transmission oil cooler to the front engine mounting bracket with the bolt (A).

    2. Install the bolt (B) to the transmission oil cooler.

      Torque:
      14 N*m  { 138 kgf*cm, 10 ft.*lbf }
    3. Install the bolt (C) to the transmission oil cooler.

      Torque:
      14 N*m  { 138 kgf*cm, 10 ft.*lbf }
    4. Tighten the bolt (A).

      Torque:
      14 N*m  { 138 kgf*cm, 10 ft.*lbf }
    5. Connect the inlet oil cooler hose and outlet oil cooler hose to the transmission oil cooler, and slide the 2 clips to secure them.

    6. Connect the No. 3 water by-pass hose and No. 4 water by-pass hose and slide the 2 clips to secure them.

  2. INSTALL BATTERY

    Click here

  3. INSTALL INLET AIR CLEANER ASSEMBLY

    Click here

  4. INSTALL COOL AIR INTAKE DUCT SEAL

    Click here

  5. ADD ENGINE COOLANT

    Click here

  6. ADD AUTOMATIC TRANSAXLE FLUID

    Click here

  7. INSPECT FOR COOLANT LEAK

    Click here

  8. INSTALL FRONT FENDER APRON SEAL LH

    Click here

  9. INSTALL ENGINE UNDER COVER LH

    Click here

  10. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH

    Click here