COMBINATION SWITCH INSTALLATION

PROCEDURE


  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY


    1. Install the integration control and panel assembly to the upper console panel sub-assembly with the 2 screws.

  2. INSTALL SWITCH BASE

    Click here

  3. INSTALL CONSOLE PANEL SUB-ASSEMBLY

    Click here