PARK / NEUTRAL POSITION SWITCH INSPECTION

PROCEDURE


  1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. A01W1YKE13
      Text in Illustration
      *a

      Component without harness connected

      (Park/Neutral Position Switch Assembly)

      Measure the resistance according to the value(s) in the table below when the shift lever is moved to each position.

      Standard Resistance
      Tester Connection Connection Specified Condition

      1 (RB) - 3 (PL)

      4 (B) - 9 (L)

      Shift lever in P Below 1 Ω
      Shift lever not in P 10 kΩ or higher
      1 (RB) - 2 (RL) Shift lever in R Below 1 Ω
      Shift lever not in R 10 kΩ or higher

      1 (RB) - 8 (NL)

      4 (B) - 9 (L)

      Shift lever in N Below 1 Ω
      Shift lever not in N 10 kΩ or higher
      1 (RB) - 7 (DL) Shift lever in D, S, "+" or "-" Below 1 Ω
      Shift lever not in D, S, "+" or "-" 10 kΩ or higher

      If the result is not as specified, replace the park/neutral position switch assembly.