ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Clean the oil cooler assembly contact surface on the cooler mounting.

    2. Install a new O-ring to the oil cooler assembly.

    3. Install the oil cooler assembly with the oil cooler union bolt.

      Torque:
      68 N*m  { 693 kgf*cm, 50 ft.*lbf }
    4. Install the No. 4 water by-pass hose and No. 5 water by-pass hose with the bolt, 2 clamps and 4 clips.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  2. INSTALL EXHAUST MANIFOLD ASSEMBLY LH

    Click here

  3. ADD ENGINE COOLANT

    Click here

  4. ADD ENGINE OIL

    Click here

  5. INSPECT FOR COOLANT LEAK

    Click here

  6. INSPECT FOR OIL LEAK

  7. INSPECT ENGINE OIL LEVEL

    Click here