PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL PURGE VALVE (PURGE VSV)


    1. A01W2JXE02
      Text in Illustration
      *1 Fuel Vapor Hose
      *2 Fuel Vapor Feed Hose Assembly
      *a Left
      *b Front
      *c Back
      *d 60°
      *e 4 to 9 mm (0.157 to 0.354 in.)
      *f 2 to 7 mm (0.0787 to 0.276 in.)
      *g Paint Mark

      Install the purge valve (purge VSV) to the intake manifold with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the purge valve (purge VSV) connector.

    3. Connect the fuel vapor feed hose assembly to the purge valve (purge VSV) and slide the clip to secure it.

      Tech Tips

      Make sure the direction of the clip is as shown in the illustration.

    4. Connect the fuel vapor hose to the purge valve (purge VSV) and slide the clip to secure it.

      Tech Tips

      Make sure the direction of the clip is as shown in the illustration.