PROCEDURE
REMOVE FRONT WHEEL OPENING EXTENSION PAD RH
REMOVE ENGINE UNDER COVER RH
REMOVE FRONT WHEEL OPENING EXTENSION PAD LH
REMOVE ENGINE UNDER COVER LH
DRAIN ENGINE COOLANT
REMOVE V-BANK COVER SUB-ASSEMBLY
REMOVE AIR CLEANER CAP SUB-ASSEMBLY
Disconnect the mass air flow meter connector and wire harness clamp.
Disconnect the 3 hoses.
Disconnect the ventilation hose from the air cleaner cap sub-assembly.
Loosen the hose clamp and separate the air cleaner cap sub-assembly from the throttle with motor body assembly.
Release the 2 clamps and remove the air cleaner cap sub-assembly.
REMOVE THROTTLE WITH MOTOR BODY ASSEMBLY
Disconnect the 2 water by-pass hoses from the throttle with motor body assembly.
Disconnect the throttle with motor body assembly connector and wire harness clamp.
Remove the 4 bolts, throttle with motor body assembly and wire harness clamp stay.
Remove the gasket from the intake air surge tank assembly.