INTEGRATION RELAY INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 INTEGRATION RELAY


    1. Connect the 4 No. 1 integration relay connectors.

    2. Engage the 2 claws to install the No. 1 integration relay to the engine room relay block and junction block assembly.

    3. Connect the No. 1 integration relay connector.

  2. INSTALL NO. 1 RELAY BLOCK COVER