THROTTLE BODY REMOVAL

PROCEDURE


  1. DRAIN ENGINE COOLANT

    Click here

  2. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here

  3. REMOVE AIR CLEANER CAP SUB-ASSEMBLY


    1. A01W21J

      Disconnect the vacuum switching valve assembly from the air cleaner cap sub-assembly.

    2. A01W03C

      Disconnect the mass air flow meter connector and separate the 2 wire harness clamps from the air cleaner cap sub-assembly.

    3. A01W0XT

      Separate the fuel vapor feed hose from the air cleaner cap sub-assembly.

    4. A01W145

      Disconnect the ventilation hose from the cylinder head cover.

    5. A01VZOO

      Loosen the hose clamp and disconnect the air cleaner cap sub-assembly from the throttle with motor body assembly.

    6. A01W429

      Release the 2 clamps and remove the air cleaner cap sub-assembly.

  4. REMOVE THROTTLE WITH MOTOR BODY ASSEMBLY


    1. A01W5KB

      Disconnect the fuel tube from the fuel tube bracket.

    2. Disconnect the throttle with motor body assembly connector.

    3. A01VZRX

      Disconnect the No. 1 water by-pass hose from the throttle with motor body assembly.

    4. Disconnect the No. 2 water by-pass hose from the throttle with motor body assembly.

    5. A01W43B

      Remove the 4 bolts, throttle with motor body assembly and fuel tube bracket.

    6. A01W4O6

      Remove the bolt and fuel tube bracket.

    7. A01W27V

      Remove the gasket from the intake manifold.