COMBINATION METER INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION METER SUB-ASSEMBLY


    1. Connect each connector.

    2. Engage the clamp.

    3. A005BPU

      Move the combination meter sub-assembly as shown in the illustration.

    4. Install the combination meter sub-assembly with the 4 screws.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

    Click here

  3. INSTALL NO. 2 HEATER TO REGISTER DUCT SUB-ASSEMBLY

    Click here

  4. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

    Click here

  5. INSTALL CENTER INSTRUMENT PANEL REGISTER ASSEMBLY

    Click here

  6. INSTALL INSTRUMENT PANEL BOX ASSEMBLY

    Click here

  7. INSTALL INTEGRATION CONTROL AND PANEL

    Click here

  8. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  9. INSTALL DECK FLOOR BOX RH

    Click here

  10. INSTALL REAR DECK FLOOR BOX

    Click here

  11. INSTALL NO. 1 DECK BOARD

    Click here

  12. INSTALL NO. 2 DECK BOARD

    Click here

  13. INSTALL DECK BOARD ASSEMBLY

    Click here