ECM INSTALLATION

CAUTION / NOTICE / HINT

Note

If the ECM has been struck or dropped, replace it.

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque:
      4.5 N*m  { 46 kgf*cm, 40 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

  3. INSTALL ECM


    1. Install the ECM with the nut and bolt.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }

      Note

      If the ECM has been struck or dropped, replace it.

    2. B006BDPC01
      *A for RHD
      *B for LHD

      Connect the 3 connectors to the ECM and push down the lever to lock it.

  4. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  6. GPF DEPOSITION VALUES (w/ GPF)

    Note

    Before replacing the ECM, store the volumes of accumulated ash (metal oxide) and PM (Particulate Matter). After replacing the ECM, write the volumes of accumulated ash and PM to the new ECM. (w/ Gasoline Particulate Filter)

    Click here