FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE

  1. INSTALL TIMING CHAIN COVER OIL SEAL

    1. A157500E01

      Apply MP grease to the lip of a new oil seal.

      Note:
      • Do not allow foreign matter to contact the lip of the oil seal.

      • Do not allow MP grease to contact the dust seal.

    2. Using SST and a hammer, tap in the oil seal until its surface is flush with the timing chain cover edge.

      09223-22010

      Note:
      • Wipe off any extra grease from the crankshaft.

      • Do not tap in the oil seal at an angle.

  2. INSTALL CRANKSHAFT PULLEY

    1. A236399C03

      *a

      Hold

      V100135

      Turn

      Align the key groove of the crankshaft pulley with the pulley set key.

    2. Temporarily install the crankshaft pulley with the pulley bolt.

    3. Using SST, hold the crankshaft pulley in place and tighten the pulley bolt.

      09213-54015

      09330-00021

      190 N*m

      1937 kgf*cm

      140 ft.*lbf

      Tip:

      Part number of installation bolt for SST (crankshaft pulley holding tool): 91551-00850 (quantity: 2).

  3. INSTALL V-RIBBED BELT

  4. ADJUST V-RIBBED BELT

  5. INSPECT V-RIBBED BELT

  6. INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH

  7. INSPECT FOR OIL LEAK

  8. INSPECT ENGINE OIL LEVEL

  9. INSTALL REAR ENGINE UNDER COVER RH

  10. INSTALL NO. 1 ENGINE UNDER COVER

  11. INSTALL NO. 2 CYLINDER HEAD COVER