GENERATOR(for 100 A Type) INSTALLATION
PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the wire harness clamp bracket with the bolt.
7.7 N*m
79 kgf*cm
68 in.*lbf
-
Temporarily install the generator with the bolt.
-
Temporarily install the adjusting bar with the 2 bolts.
Install the wire harness to terminal B with the nut.
9.8 N*m
100 kgf*cm
87 in.*lbf
Install the terminal cap.
Connect the connector and attach the wire harness clamp.
-
Tighten the bolt.
25 N*m
255 kgf*cm
18 ft.*lbf
INSTALL V-RIBBED BELT
ADJUST V-RIBBED BELT
INSPECT V-RIBBED BELT
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereClick hereClick hereClick hereClick hereClick here
INSTALL NO. 2 CYLINDER HEAD COVER
INSTALL REAR ENGINE UNDER COVER RH
INSTALL NO. 1 ENGINE UNDER COVER