MASS AIR FLOW METER INSTALLATION

PROCEDURE


  1. INSTALL MASS AIR FLOW METER


    1. Install the mass air flow meter with the 2 screws.

      Torque:
      1.0 N*m  { 10 kgf*cm, 9 in.*lbf }
    2. Connect the mass air flow meter.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Click here