BACK DOOR ADJUSTMENT

CAUTION / NOTICE / HINT

A005DZXE01
Text in Illustration
*1 Centering Bolt
*2 Standard Bolt

Tech Tips


  • Use the same procedure for the RH side and LH side.

  • The following procedure is for the LH side.

  • Centering bolts are used to mount the door hinge to the vehicle body and door. The door cannot be adjusted with the centering bolts installed. Substitute the centering bolts with standard bolts (with washers) when making adjustments.

  • Specified torque for standard bolts is shown in the standard bolt chart Click here.

PROCEDURE


  1. INSPECT BACK DOOR


    1. Check that the clearance measurements of areas *a through *j are within each standard range.

      A005CTDE01
      Standard Clearance
      Area Measurement Area Measurement
      *a 6.2 to 9.2 mm (0.244 to 0.362 in.) *b -0.1 to 2.9 mm (-0.00394 to 0.114 in.)
      *c 6.2 to 9.2 mm (0.244 to 0.362 in.) *d -0.1 to 2.9 mm (-0.00394 to 0.114 in.)
      *e 0.05 to 4.05 mm (0.00197 to 0.159 in.) *f 2.85 to 6.85 mm (0.112 to 0.270 in.)
      *g 3.0 to 7.0 mm (0.118 to 0.276 in.) *h 3.0 to 7.0 mm (0.118 to 0.276 in.)
      *i 4.0 to 8.0 mm (0.157 to 0.315 in.) *j 4.0 to 8.0 mm (0.157 to 0.315 in.)
  2. REMOVE DECK BOARD ASSEMBLY

    Click here

  3. REMOVE NO. 2 DECK BOARD

    Click here

  4. REMOVE REAR DECK FLOOR BOX

    Click here

  5. REMOVE BACK DOOR SCUFF PLATE

    Click here

  6. ADJUST BACK DOOR


    1. A005A47

      Before adjusting the upper end of the back door up and down or left and right, loosen the bolts.

    2. Tighten the body side hinge after adjustment.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
    3. A005DVF

      Using a T40 "TORX" socket wrench, slightly loosen the striker mounting screws.

    4. Using a brass bar and a hammer, hit the striker to adjust its position.

    5. Using a T40 "TORX" socket wrench, tighten the striker mounting screws after adjustment.

      Torque:
      23 N*m  { 235 kgf*cm, 17 ft.*lbf }
  7. INSTALL BACK DOOR SCUFF PLATE

    Click here

  8. INSTALL REAR DECK FLOOR BOX

    Click here

  9. INSTALL NO. 2 DECK BOARD

    Click here

  10. INSTALL DECK BOARD ASSEMBLY

    Click here