PROCEDURE
INSTALL INJECTION PUMP DELIVERY VALVE SUB-ASSEMBLY
Install 4 new delivery valve gaskets and the 4 injection pump delivery valve sub-assemblies to the injection pump assembly.
Install the 4 delivery valve springs to the 4 injection pump delivery valve holders.
Using SST, install the injection pump delivery valve holder to the injection pump assembly.
INSTALL DISTRIBUTIVE HEAD PLUG
Install a new O-ring to the distributive head plug.
Using SST, install the distributive head plug to the injection pump assembly.
INSTALL TIMING CONTROL VALVE ASSEMBLY
Using a 5 mm hexagon wrench, install the timing control valve to the injection pump assembly with the 2 bolts.
INSTALL WIRING HARNESS BRACKET
Install the wiring harness bracket with the bolt to the injection pump assembly.
INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE
Install a new air bleeder nipple washer and the screw to the injection pump assembly.
Install 2 new air bleeder nipple washers and the fuel filter to injection pump fuel pipe to the injection pump assembly with the cap nut.
INSTALL NO. 4 NOZZLE LEAKAGE PIPE
Install 2 new air bleeder nipple washers and the No. 4 nozzle leakage pipe to the injection pump assembly with the overflow screw sub-assembly.