OIL COOLER INSTALLATION

PROCEDURE

  1. INSTALL TRANSMISSION OIL COOLER

    1. Apply Toyota Genuine CVT Fluid FE to 2 new O-rings.

    2. Install the 2 O-rings to the transmission oil cooler.

    3. Install the transmission oil cooler to the continuously variable transaxle assembly with the 3 bolts.

      21 N*m

      214 kgf*cm

      15 ft.*lbf

  2. CONNECT WATER BY-PASS HOSE

    1. Connect the water by-pass hose and slide the 2 clips to secure it.

      Note:

      Fully insert the No. 5 water by-pass hose to the 2nd rib on each oil cooler pipe.

  3. INSTALL BATTERY CARRIER

  4. CONNECT RADIATOR PIPE

    1. Connect the radiator pipe to the battery carrier with the 2 bolts.

      19 N*m

      189 kgf*cm

      14 ft.*lbf

  5. INSTALL BATTERY TRAY

  6. INSTALL BATTERY

  7. INSTALL BATTERY CLAMP SUB-ASSEMBLY

  8. ADD ENGINE COOLANT

  9. ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

  10. INSPECT FOR COOLANT LEAK

  11. INSPECT FOR FLUID LEAK

  12. INSTALL REAR ENGINE UNDER COVER LH

  13. INSTALL NO. 1 ENGINE UNDER COVER