OIL COOLER INSTALLATION
PROCEDURE
INSTALL TRANSMISSION OIL COOLER
Apply Toyota Genuine CVT Fluid FE to 2 new O-rings.
Install the 2 O-rings to the transmission oil cooler.
Install the transmission oil cooler to the continuously variable transaxle assembly with the 3 bolts.
21 N*m
214 kgf*cm
15 ft.*lbf
CONNECT WATER BY-PASS HOSE
Connect the water by-pass hose and slide the 2 clips to secure it.
Note:Fully insert the No. 5 water by-pass hose to the 2nd rib on each oil cooler pipe.
INSTALL BATTERY CARRIER
CONNECT RADIATOR PIPE
Connect the radiator pipe to the battery carrier with the 2 bolts.
19 N*m
189 kgf*cm
14 ft.*lbf
INSTALL BATTERY TRAY
INSTALL BATTERY
INSTALL BATTERY CLAMP SUB-ASSEMBLY
ADD ENGINE COOLANT
ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID
INSPECT FOR COOLANT LEAK
INSPECT FOR FLUID LEAK
INSTALL REAR ENGINE UNDER COVER LH
INSTALL NO. 1 ENGINE UNDER COVER