INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for EVAP)
Install the switching valve with the bolt.
Connect the 2 hoses.
Connect the connector.
INSTALL V-BANK COVER
Install the cover with the 2 nuts.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
PERFORM INITIALIZATION
Perform initialization Click here.
Note
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.