PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL PURGE VALVE


    1. Connect the joint wire harness to the purge valve.

    2. Connect the No. 1 fuel vapor feed hose and No. 2 fuel vapor feed hose, and install the purge valve with the joint wire harness.

    3. Connect the manifold absolute pressure sensor connector.

    4. Connect the purge valve connector.

    5. Install the nut and purge valve.

      Torque:
      6.4 N*m  { 65 kgf*cm, 57 in.*lbf }
  2. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

    Click here