PROCEDURE
INSPECT PURGE VSV (w/ Canister Pump Module)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the purge VSV.
Check the operation of the purge VSV.
| *a | Port E |
| *b | Port F |
|
Air |
Check that air does not flow from port F when air is applied to port E.
| *a | Port E |
| *b | Port F |
|
Air |
Apply battery voltage to the connector, and check the VSV operation.
| OK | ||||
|---|---|---|---|---|
|
If the result is not as specified, replace the purge VSV.
INSPECT PURGE VSV (w/o Canister Pump Module)
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Check the operation of the purge VSV.
| *a | Port E |
| *b | Port F |
| *c | Air |
Check that air does not flow from port F when air is applied to port E.
| *a | Port E |
| *b | Port F |
| *c | Terminal 1 |
| *d | Terminal 2 |
| *e | Air |
Apply battery voltage between the terminals of purge VSV, and check the purge VSV operation.
| OK | ||||
|---|---|---|---|---|
|
Tech Tips
If the result is not as specified, replace the purge VSV.