ENGINE OIL COOLER(w/ Oil Cooler) INSTALLATION

PROCEDURE

  1. INSTALL OIL COOLER ASSEMBLY

    1. Clean the oil cooler assembly contact surface on the cooler mounting.

    2. Apply a light coat of engine oil to 3 new gaskets.

    3. Install the 3 new gaskets to the oil cooler assembly.

    4. Temporarily install the oil cooler assembly with the union bolt, the nut and a new seal washer.

    5. A296893C01

      *1

      Seal Washer

      *2

      Union Bolt

      *3

      Nut

      Tighten the bolt and nut in several steps in the sequence shown in the illustration.

      for union bolt

      60 N*m

      612 kgf*cm

      44 ft.*lbf

      for nut

      10 N*m

      102 kgf*cm

      7 ft.*lbf

  2. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

  3. ADD ENGINE OIL

  4. ADD ENGINE COOLANT

  5. INSPECT ENGINE OIL LEVEL

  6. INSPECT FOR OIL LEAK

  7. INSPECT FOR COOLANT LEAK