PURGE VALVE INSPECTION

PROCEDURE

  1. INSPECT PURGE VSV

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection

      Condition

      Specified Condition

      1 - 2

      20°C (68°F)

      23 to 26 Ω

      1 - VSV body ground

      Always

      10 MΩ or higher

      2 - VSV body ground

      10 MΩ or higher

      If the result is not as specified, replace the purge VSV.

    2. Check the operation of the purge VSV.

      1. A293414C01

        *1

        Port E

        *2

        Port F

        V100135

        Air

        Check that air does not flow from port F when air is applied to port E.

      2. A293415C01

        *1

        Port E

        *2

        Port F

        *3

        Terminal 1

        *4

        Terminal 2

        V100135

        Air

        Apply battery voltage to the connector, and check the VSV operation.

        OK

        Measurement Condition

        Specified Condition

        Battery positive (+) → Terminal 1

        Battery negative (-) → Terminal 2

        Air flows from port E to port F

        If the result is not as specified, replace the purge VSV.